Structure
Workpackages schema
To achieve its objectives the DESCRAMBLE work plan has been broken down to a set of six work packages.
Workpackage interconnections
Each WP has its specific tasks, but there are strong interrelationships between different activities. A graphical view of the most important interconnections:
The table below gives an outline of each WP’s main tasks and objectives.
WP number |
WP title |
Lead beneficiary |
Main tasks and objectives |
WP leader |
WP1 |
Management |
1 - EGP |
- Project administration & interface with EC
- Deliverables management and quality control
|
Alessio De Marzo |
WP2 |
Well Drilling |
1 - EGP |
- Material, cement, casing, drilling fluid, BHA
- Preparation and execution of drilling activities
- Real time well control
- Sampling log and well testing
- Health, safety and environmental aspects
|
Luca Semiotti |
WP3 |
Special Instruments and Tools |
7 - STIFTELSEN SINTEF |
- Design, construction and laboratory testing
- In situ test at supercritical conditions
- Geophysical activities: seismic survey, and monitoring
- Data integration and interpretation
- Rock and fluid analysis
- Well log interpretation
|
Øyvind Stamnes |
WP4 |
Reservoir Characterization |
2 - CNR |
- Geophysical activities: seismic survey, and monitoring
- Data integration and interpretation
- Rock and fluid analysis
- Well log interpretation
|
Andrea Dini |
WP5 |
Reservoir Modelling |
3 - RWTH AACHEN |
- Implementation of the reservoir simulators for the expected conditions
- In situ test at supercritical conditions
|
Henrik Büsing |
WP6 |
Dissemination |
2 - CNR |
- Communication
- Website
- Project conference
|
Adele Manzella |